The drawing

A-201 Exterior Elevations, Millbrook Branch LibraryARCH D sheet, 36 by 24 inches. Drawn at 1/8" = 1'-0" and 1/8" = 1'-0" and 1/8" = 1'-0" and 1/8" = 1'-0". Use the layer tray and the measure tool below the drawing.ABCDEL1LEVEL 1 0'-0"L2LEVEL 2 14'-0"RBROOF BEARING 26'-0"TPTOP OF PARAPET 29'-0"14'-0"12'-0"3'-0"29'-0"10'-0"8'-0"3'-0"11121314151 NORTH ELEVATION1/8" = 1'-0"ABCDEL1LEVEL 1 0'-0"L2LEVEL 2 14'-0"RBROOF BEARING 26'-0"TPTOP OF PARAPET 29'-0"29'-0"2 SOUTH ELEVATION1/8" = 1'-0"123L1LEVEL 1 0'-0"L2LEVEL 2 14'-0"RBROOF BEARING 26'-0"TPTOP OF PARAPET 29'-0"29'-0"3 WEST ELEVATION1/8" = 1'-0"123L1LEVEL 1 0'-0"L2LEVEL 2 14'-0"RBROOF BEARING 26'-0"TPTOP OF PARAPET 29'-0"29'-0"4 EAST ELEVATION1/8" = 1'-0"ELEVATION NOTES1. Elevations are named for the face of the building they show, not for the direction you are looking. The north elevation is the north face, seen by an observer standing to the north.2. Grid bubbles run above each elevation in the order you would see them from outside, so the south elevation reads E to A.3. Heights are given above the Level 1 finish floor, which is the project datum and is written 0'-0".4. Head and sill heights on Level 2 openings are dimensioned from the Level 2 floor, not from the datum. Read which line a dimension starts at before you use it.5. Window types are scheduled on A-601. Sizes are not repeated here.MATERIAL KEYNOTES11Brick veneer over 6 in steel stud, see 3/A-401.12Prefinished metal panel facing the parapet, above the roof bearing line.13Aluminium storefront entrance, see the door schedule on A-601.14Metal coping over the parapet, see 1/A-401.15Finish grade. Hold 6 in below the top of the slab at the wall.LEVEL DATUMSL1 Level 1 0'-0"L2 Level 2 14'-0"RB Roof bearing 26'-0"TP Top of parapet 29'-0"08'-0"16'-0"24'-0"32'-0"1/8" = 1'-0"NEXTERIOR MATERIALSBrick veneer on stainless ties, running bondPrefinished metal wall panel, standing seamSingle ply roof membrane behind the parapetCast in place concrete foundation wallMATERIAL EXTENTMATERIALBrick veneerMetal wall panelRoof membraneFoundation wallSTARTS ATGradeRoof bearing 26'-0"Roof bearing 26'-0"Top of footingSTOPS ATRoof bearing 26'-0"Top of parapet 29'-0"Parapet cap, 1/A-401GradeMATERIAL NOTES1. Every material change happens on a line that is either a datum or a dimension. Brick stops and panel starts at the roof bearing line on all four faces, so one line answers the question on every elevation.2. Opening sizes are not given here. Doors and windows are scheduled on A-601 and located by the plans.3. Coping, flashing and the panel to brick junction are drawn at a larger scale on A-401. An elevation says what, a detail says how.Northgate Design StudioArchitecture and interiorsStructural and civil: Kestrel EngineeringPROJECTMillbrook Branch Library412 Kestrel Avenue, MillbrookMillbrook Public Library DistrictProject number 2026-114ISSUE2026-08-14 Issued for constructionSCALE1/8" = 1'-0"DRAWNNDSCHECKEDQAREVISIONSNODATEDESCRIPTIONSHEET TITLEExterior ElevationsSHEET NUMBERA-201
100%

Turn on Measure, then click two points on the drawing.

Layers on A-201

Drag to pan, scroll or pinch to zoom, or use the buttons. With the drawing focused, the arrow keys pan, plus and minus zoom, and 0 fits the sheet. Every tag, marker and dimension is a focusable target: press Tab to walk them and Enter to select one.

11 questions in the bank draw on this sheet.

How to read this sheet

An elevation is a flat view of one face of the building, drawn with no perspective at all, so anything parallel to that face measures true on the paper. There are four of them here, one for each side, stacked down the sheet and all at 1/8" = 1'-0".

Start with the names. An elevation is named for the face it shows, not for the direction you are looking in. The north elevation is the north face of the building, seen by somebody standing outside to the north and looking south. The consequence is that the grid runs the other way on opposite elevations. On the north elevation grid A is on the left and E on the right, exactly as it is on the floor plan. Walk round to the south side and A is now on your right, so the south elevation reads E, D, C, B, A from left to right. Read the bubbles before you point at anything.

Next find the horizontal lines that run right across each elevation and out past the building on both sides. Those are the level datums, and they are the spine of every vertical dimension in the set. Level 1 is the project datum and is written 0'-0". Level 2 is 14'-0" above it, the roof bearing is 26'-0" and the top of the parapet is 29'-0". Each line carries a small bubble with a code and a caption with the full name and the height. The same four numbers appear on A-301 and on the cover sheet, because they all read the same table.

The vertical dimension string on the right of the north elevation breaks that 29'-0" into its parts: 14'-0" floor to floor, 12'-0" from Level 2 up to the roof bearing, and 3'-0" of parapet above that. Add the three and you get the overall, which is the same self checking arithmetic a plan gives you horizontally.

Openings are drawn where the plans put them and at the heights the window units carry. Watch the datum a head or sill dimension starts from. The head dimension at the Children's Library window is measured from Level 1, so it reads 10'-0". The head dimension at the Study Room A window on Level 2 is measured from the Level 2 floor, so it reads 8'-0" even though that head is 22'-0" above the project datum. Both are correct and they are not the same number.

Finally the materials. Two hatches divide each face: brick veneer from grade up to the roof bearing line, and prefinished metal panel on the parapet above it. The hexagons are material keynotes and the list on the right of the sheet spells them out, with two of them handing you on to a detail on A-401.