The drawing

A-601 Door, Window and Room Finish Schedules, Millbrook Branch LibraryARCH D sheet, 36 by 24 inches. Drawn at 1/4" = 1'-0" and 1/4" = 1'-0". Use the layer tray and the measure tool below the drawing.DOOR SCHEDULEDOOR101A101B102A103A104A105A105B106A107A108A109A110A111A112A113A201A201B202A202B203A204A205A206A207A208A209A210A212AROOM101 Vestibule101 Vestibule102 Lobby103 Circulation Desk104 Children's Library105 Community Room105 Community Room106 Storage107 Staff Workroom108 Toilet109 Toilet110 Mechanical111 Electrical112 Stair 1113 Elevator201 Reading Room201 Reading Room202 Adult Stacks202 Adult Stacks203 Study Room A204 Study Room B205 Quiet Room206 Staff Office207 Toilet208 Toilet209 Stair 1210 Elevator212 JanitorSIZE3'-0" pair x 7'-0"3'-0" pair x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" pair x 7'-0"3'-6" x 7'-0"3'-6" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-6" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"1'-9" pair x 7'-0"3'-0" pair x 7'-0"3'-0" x 7'-0"3'-0" pair x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"3'-0" x 7'-0"1'-9" pair x 7'-0"3'-0" x 7'-0"TYPESFSFF1F1F2HM1HM1HM1F1F1F1HM1HM1HM1ELF2F1F2F1F1F1F1F1F1F1HM1ELHM1MATERIALAluminiumAluminiumWoodWoodWoodHollow metalHollow metalHollow metalWoodWoodWoodHollow metalHollow metalHollow metalStainless steelWoodWoodWoodWoodWoodWoodWoodWoodWoodWoodHollow metalStainless steelHollow metalFRAMEFR2FR2FR1FR1FR1FR1FR1FR1FR1FR1FR1FR1FR1FR1FR3FR1FR1FR1FR1FR1FR1FR1FR1FR1FR1FR1FR3FR1RATINGNoneNoneNoneNoneNone90 minNoneNoneNoneNoneNone45 min45 min90 min90 minNoneNoneNoneNoneNoneNoneNoneNoneNoneNone90 min90 minNoneHDWHW-1HW-2HW-3HW-3HW-2HW-4HW-1HW-3HW-3HW-5HW-5HW-4HW-4HW-4HW-6HW-2HW-3HW-2HW-3HW-3HW-3HW-3HW-3HW-5HW-5HW-4HW-6HW-3REMARKSExterior, weatherstrip, threshold and sweepPair, hold both leaves in the clear openingNoneNonePair, hold both leaves in the clear opening90 minute rated assembly, label leaf and frameExterior, weatherstrip, threshold and sweepNoneNoneNoneNone45 minute rated assembly, label leaf and frame45 minute rated assembly, label leaf and frame90 minute rated assembly, label leaf and frameHoistway entrance, 90 minute ratedPair, hold both leaves in the clear openingNonePair, hold both leaves in the clear openingNoneNoneNoneNoneNoneNoneNone90 minute rated assembly, label leaf and frameHoistway entrance, 90 minute ratedNoneSizes are the leaf size. A pair gives that leaf width twice in the clear opening.ROOM FINISH SCHEDULEROOM101102103104105114112113108109111110107106201202203204211209210207208212205206NAMEVestibuleLobbyCirculation DeskChildren's LibraryCommunity RoomCorridorStair 1ElevatorToiletToiletElectricalMechanicalStaff WorkroomStorageReading RoomAdult StacksStudy Room AStudy Room BCorridorStair 1ElevatorToiletToiletJanitorQuiet RoomStaff OfficeFLOORWalk off tileTerrazzoTerrazzoCarpet tileResilient plankResilient plankSealed concreteResilient plankPorcelain tilePorcelain tileSealed concreteSealed concreteCarpet tileSealed concreteCarpet tileCarpet tileCarpet tileCarpet tileResilient plankSealed concreteResilient plankPorcelain tilePorcelain tileSealed concreteCarpet tileCarpet tileBASETile baseTerrazzo baseTerrazzo baseResilient baseWood baseResilient baseResilient baseResilient baseTile baseTile baseNoneNoneResilient baseResilient baseResilient baseResilient baseResilient baseResilient baseResilient baseResilient baseResilient baseTile baseTile baseResilient baseResilient baseResilient baseWALLSPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPorcelain tile to 4'-0", painted abovePorcelain tile to 4'-0", painted abovePainted concrete blockPainted concrete blockPainted gypsum boardPainted concrete blockPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPainted gypsum boardPorcelain tile to 4'-0", painted abovePorcelain tile to 4'-0", painted abovePainted concrete blockPainted gypsum boardPainted gypsum boardCEILINGPainted gypsum boardExposed structure, paintedAcoustic panelAcoustic panelAcoustic panelAcoustic panelPainted gypsum boardCab finish by the elevator supplierPainted gypsum boardPainted gypsum boardExposed structureExposed structureAcoustic panelExposed structure, paintedAcoustic panelAcoustic panelAcoustic panelAcoustic panelAcoustic panelPainted gypsum boardCab finish by the elevator supplierPainted gypsum boardPainted gypsum boardPainted gypsum boardAcoustic panelAcoustic panelCLG HT9'-0"12'-0"10'-0"10'-0"12'-0"9'-0"9'-0"8'-0"9'-0"9'-0"10'-0"10'-0"9'-0"9'-0"11'-0"11'-0"9'-0"9'-0"9'-0"9'-0"8'-0"9'-0"9'-0"9'-0"9'-0"9'-0"REMARKSWalk off tile runs the full width of the openingNoneSee the casework elevation on A-501Carpet tile laid in a quarter turn patternAcoustic wall panel on the north wallHold the 6'-0" clear width to the face of finishSealed concrete treads and landingsCab interior by the elevator supplierAccessible toilet room, see 1/A-501Accessible toilet room, see 1/A-501Plywood backboard on the north wallSeal the floor under the equipment padNoneNoneNoneNoneAcoustic partition to the deck aboveAcoustic partition to the deck aboveHold the 6'-0" clear width to the face of finishSealed concrete treads and landingsCab interior by the elevator supplierAccessible toilet roomAccessible toilet roomFloor drain and mop sinkNoneNoneWINDOW SCHEDULETYPEW1W2W3W4W5W6SIZE3'-0" x 5'-0"4'-0" x 5'-0"6'-0" x 8'-0"2'-0" x 4'-0"8'-0" x 8'-0"3'-0" x 3'-0"MATERIALAluminiumAluminiumAluminium storefrontAluminiumAluminium storefrontAluminiumOPERATIONFixedAwningFixedFixedFixed, two liteFixedGLAZING1 in insulating, clear1 in insulating, clear1 in insulating, low emissivity1 in insulating, obscure1 in insulating, low emissivity1 in insulating, obscureHEAD HEIGHT8'-0"8'-0"10'-0"8'-0"10'-0" at Level 1, 9'-0" at Level 28'-0"UNITS762261Head height is measured above the finish floor of the level the unit sits on.13 DOOR TYPE ELEVATIONSF13'-0"F26'-0" pairSF6'-0" pairHM13'-6"EL3'-6" pairTwo speed7'-0"3'-0"04'-0"8'-0"12'-0"16'-0"1/4" = 1'-0"14 FRAME TYPE ELEVATIONSFR1Hollow metalFR2Storefront, transom over7'-0"Transom lite overDOOR TYPESF1 Single leaf flush door, solid core, no liteF2 Pair of flush leaves, no astragal, no liteSF Aluminium storefront leaf in a storefront frameHM1 Flush hollow metal leaf with a narrow vision liteEL Two speed sliding hoistway entrance by the elevator supplierFRAME TYPESFR1 Welded hollow metal frame, 2 in face, anchored to the studFR2 Thermally broken aluminium storefront frameFR3 Stainless steel hoistway entrance frame by the elevator supplierHARDWARE SETSHW-1 Exterior entrance: panic device, closer, threshold, weatherstrip, cylinderHW-2 Interior pair: push and pull, closer, floor stopHW-3 Interior single: passage or office lock set, hinges, wall stopHW-4 Rated single: lock set, closer, smoke gasket, self closing hingesHW-5 Toilet room: push and pull, closer, kick plate, occupancy indicatorHW-6 Hoistway entrance: hardware by the elevator supplierHOW TO USE THESE SCHEDULES1. Read every tag on a plan against its row here before ordering anything.2. A door tag is the room number plus a letter, and it names the door that swings into that room. A window tag is a type, so several openings share one row and the size comes from the type, not from the plan.3. Sizes in the door schedule are leaf sizes. For a pair, the clear opening is that width twice, less the stops and any astragal.4. A rating in the door schedule applies to the whole assembly: leaf, frame, hardware and any lite. Do not substitute one part of a rated assembly.5. Finishes are given by room number. Where a room has two wall finishes the schedule says where each one stops, here at 4'-0" above the finish floor.6. Ceiling heights in the finish schedule agree with the reflected ceiling plan on A-121. Where they differ, the reflected ceiling plan governs.Northgate Design StudioArchitecture and interiorsStructural and civil: Kestrel EngineeringPROJECTMillbrook Branch Library412 Kestrel Avenue, MillbrookMillbrook Public Library DistrictProject number 2026-114ISSUE2026-08-14 Issued for constructionSCALEAs notedDRAWNNDSCHECKEDQAREVISIONSNODATEDESCRIPTIONSHEET TITLEDoor, Window and Room Finish SchedulesSHEET NUMBERA-601
100%

Turn on Measure, then click two points on the drawing.

Layers on A-601

Drag to pan, scroll or pinch to zoom, or use the buttons. With the drawing focused, the arrow keys pan, plus and minus zoom, and 0 fits the sheet. Every tag, marker and dimension is a focusable target: press Tab to walk them and Enter to select one.

12 questions in the bank draw on this sheet.

How to read this sheet

A schedule sheet has no drawing to orient yourself in, so the way in is always a tag you picked up somewhere else. You are on A-101, you see a hexagon marked 105A, and you come here to find out what that door actually is. Everything on A-601 is built for that trip: tag, row, cell.

The door schedule is the largest table on the sheet and it holds one row for every door in the building, twenty eight of them, on both levels. The tag in the first column is the room number plus a letter, so 105A is the first door into room 105 and 105B is the second. Read across: the room the door serves, the leaf size, the type mark, the leaf material, the frame mark, the fire rating, the hardware set, and the remarks. Two of those columns are references to other parts of this sheet rather than answers in themselves. The type mark sends you to the door type elevations, where F1 is a single flush leaf, F2 a pair of them, SF a storefront leaf, HM1 a hollow metal leaf with a vision panel, and EL a hoistway entrance. The frame mark sends you to the frame type elevations beside them.

Two traps live in the size column. The first is that a schedule gives the leaf size, not the opening. A pair listed as 3'-0" is two leaves of three feet, so the clear opening is close to six feet and not three. The second is that the height column is the leaf height, and the rough opening a framer needs is larger by the frame and the clearances, which is what the frame type elevation is for.

The window schedule is short because it is organised by type, not by unit. There are six types, W1 through W6, and a type carries the size, the material, the operation, the glazing and the head height. The plan tags the openings with the type, so twenty four windows are described by six rows. The units column tells you how many openings of that type the project holds, and where a type is used on both levels with different head heights, the head height cell says so.

The room finish schedule holds one row for every room number in the project, and it is read the same way: room tag on the plan, row here, then across to floor, base, walls, ceiling, ceiling height and remarks. The ceiling height column is the one people forget to check, because on a plan a room is just an outline and nothing on it tells you the room is twelve feet high while the corridor beside it is nine.