P-101 Level 1 Plumbing Plan, Millbrook Branch LibraryARCH D sheet, 36 by 24 inches. Drawn at 1/8" = 1'-0". Use the layer tray and the measure tool below the drawing.ABCDE123VESTIBULE101LOBBY102CIRCULATION DESK103CHILDREN'S LIBRARY104COMMUNITY ROOM105CORRIDOR114STAIR 1112ELEVATOR113TOILET108TOILET109ELECTRICAL111MECHANICAL110STAFF WORKROOM107STORAGE1064 in SAN4 in SAN3 in SAN3 in SAN3 in SAN2 in SAN2 in V3 in VTR2 in VCO-1CO-2CO-3GRAVITY WASTE SLOPES 1/4" PER FT, SEE NOTE 1WASTE AND VENT STACK CONTINUES UP TO THE LEVEL 2 TOILET ROOMS2 in CW2 in CW2 in CW2 in CW1 in CW1 in CW1 in CW3/4 in CW1-1/2 in HW1-1/2 in HW1/2 in HW1/2 in HWWH-1WH-1, 40 GAL, 6 KW ELECTRICROOF DRAIN AND OVERFLOW ABOVE, 6 IN ST DOWN IN A CHASEWC-1L-1WC-1L-1SK-1MS-1DF-1FD-1FD-1FD-1RD-1RD-1N08'-0"16'-0"24'-0"32'-0"1/8" = 1'-0"1 LEVEL 1 PLUMBING PLANSCREENED BACKGROUND IS A-101, FOR REFERENCE ONLYPLUMBING LEGENDWaste line below the slab, with sizeVent, and hot water above the ceilingCold water, with sizeCleanout, floor or wallWater heater, tagged to the scheduleFloor drain or roof drainSAN is sanitary waste, V is vent, VTR is a vent throughthe roof, CW is cold water and HW is hot water. Sizesare nominal pipe sizes in inches.PLUMBING GENERAL NOTES01. Slope gravity waste piping 3 in and smaller at 1/4" per ft in thedirection of flow. Slope 4 in piping at 1/8" per ft minimum.02. Provide a cleanout at every change of direction greater than 45 degrees,at the base of every stack, and at the wall where the building drainleaves the building.03. Vent every trap. Carry the vent stack full size through the roof andflash it into the roofing.04. Rough in fixture heights from the enlarged toilet plans and interiorelevations, not from this plan.05. Insulate all hot water piping and the first 5'-0" of cold water pipingfrom the water heater.06. Coordinate the pipe routing with the ductwork on M-101 and with thestructure before cutting or coring anything.07. Test the drainage system with water before covering. Hold the head forfifteen minutes with no drop.PLUMBING FIXTURE SCHEDULETAGWC-1L-1SK-1MS-1DF-1FD-1RD-1DESCRIPTIONWater closet, floor mounted, 1.28 gallon flushLavatory, wall hung, 0.5 gallon per minuteStaff sink, stainless steel, single bowlMop receptor, floor set, with wall guardsDrinking fountain, dual height, with bottle fillerFloor drain, 2 inch outlet with trap primerRoof drain with overflow, 6 inch outletWASTE4 in2 in2 in3 in2 in2 in6 inVENT2 in1-1/2 in1-1/2 in2 in1-1/2 in1-1/2 in-CW1 in1/2 in1/2 in3/4 in1/2 in--HW-1/2 in1/2 in3/4 in---WH-1: electric storage water heater, 40 gallons, 6 kW, 24 gallons per hour recovery.Building mains: 4 in sanitary, 3 in vent, 2 in cold water, 1-1/2 in hot water.Northgate Design StudioArchitecture and interiorsStructural and civil: Kestrel EngineeringPROJECTMillbrook Branch Library412 Kestrel Avenue, MillbrookMillbrook Public Library DistrictProject number 2026-114ISSUE2026-08-14 Issued for constructionSCALE1/8" = 1'-0"DRAWNKECHECKEDQAREVISIONSNODATEDESCRIPTIONSHEET TITLELevel 1 Plumbing PlanSHEET NUMBERP-101
100%

Turn on Measure, then click two points on the drawing.

Layers on P-101

Drag to pan, scroll or pinch to zoom, or use the buttons. With the drawing focused, the arrow keys pan, plus and minus zoom, and 0 fits the sheet. Every tag, marker and dimension is a focusable target: press Tab to walk them and Enter to select one.

8 questions in the bank draw on this sheet.

How to read this sheet

A plumbing plan carries three separate systems on one drawing, and the only way to read it is to take them one at a time. The faint linework is the architectural background from A-101, screened so it cannot be confused with plumbing work.

System one is gravity: sanitary waste and vent. Waste piping runs below the slab, so it is drawn as a hidden line, and every run carries its nominal size and the letters SAN. Follow it the way water follows it, downhill. Each fixture drops into a branch, the branches collect into the 4 in main under the south band, and the main leaves the building through the south wall to the lateral shown on C-101. Vents are dashed and go the other way, up, because a drain needs air behind the water or the trap seal pulls out. The stack marked VTR carries through the roof. Cleanouts are the small circles with a cross: one at the base of the toilet room branch, one where the main changes direction, and a two way cleanout outside the wall. A cleanout is not decoration, it is the only way anyone will ever rod that line.

System two is pressure: cold and hot water. Cold water enters through the north wall, runs east and west along Corridor 114 above the ceiling, and drops to each fixture group. The heater WH-1 sits in Mechanical 110 and hot water leaves it back along the corridor. Pressure piping does not need slope, so it is drawn as a straight run and sized by flow, not by fall. Sizes step down as the run gives water away, the same way duct sizes do on M-101: 2 in main, 1 in branch to a toilet room, 3/4 in and 1/2 in to a single fixture.

System three is storm: the roof drains and their overflows, shown as symbols on this plan with the note that the piping runs down inside a wall chase.

Now use the schedule. Every fixture on the plan carries a tag, and every tag has one row in the plumbing fixture schedule at the bottom left. The row gives the waste, vent, cold water and hot water connection sizes for that fixture. A tag with no row, or a row with no tag on the plan, is a coordination problem, and finding one is exactly the skill this sheet drills.

Two numbers on this sheet are worth committing to memory because they appear on every plumbing set you will ever open. Gravity waste 3 in and smaller falls a quarter of an inch in every foot of run. And the size written on a pipe is a nominal size, a name for the pipe, not a measurement you can take with a rule across the drawing.